Module 10: Network Access, Constraints, and Charging
1
Understanding Network Capacity Constraints
Explain what network capacity constraints are (e.g., thermal limits, voltage levels) and where they occur in transmission and distribution networks.
2
Navigating Grid Connection: Process, Constraints, and Delays
Describe the grid connection application process and explain how network capacity constraints lead to long connection queues and delays for new projects.
3
Navigating Energy Infrastructure Planning & Consent
Describe the role and challenges of the statutory planning and consent process for new energy infrastructure.
4
Understanding TNUoS Charges: Purpose, Structure, and Tariffs
Describe the purpose and high-level structure of Transmission Network Use of System (TNUoS) charges, distinguishing between generation and demand tariffs.
5
Understanding Triad: Calculating Demand-Side TNUoS Charges
Explain the methodology for calculating demand-side TNUoS charges, focusing on the 'Triad' system and its influence on large energy users.
6
Generation-Side TNUoS Charges and Locational Signals
Explain the methodology for calculating generation-side TNUoS charges and the role of locational signals in incentivizing network-efficient connections.
7
Understanding DUoS Charges: Structure and Calculation
Explain the structure and calculation of Distribution Use of System (DUoS) charges.