Skip to main content

Welcome to a Grasp lesson

Create a free account to keep studying and create your own study path.

Lesson 46

Developing a Process Audit Plan

Recommended resources

Introduction

Welcome back! In our previous lesson, we focused on formalizing process improvements by creating Standard Operating Procedures (SOPs). We established that an SOP documents the "one best way" to perform a task, creating a stable baseline. However, creating a standard is only half the battle. How do we ensure that the new procedure is consistently followed long after the project team has moved on? This is where the Control phase truly proves its value.

Today, we will address that question directly. The learning outcome for this lesson is to develop a process audit plan to ensure long-term compliance and performance.

An audit plan is a systematic, proactive approach to verifying that your new standards are being upheld and that the gains you've achieved are sustained. For a Six Sigma practitioner, this isn't about "gotcha" inspections; it's about creating a management system that reinforces the right behaviors and quickly identifies when a process begins to drift. We'll explore a powerful method used widely in manufacturing called Layered Process Audits (LPAs) and break down how to build a robust plan from the ground up.


1. The "Policing Process": Why Audits are Essential for Control

After implementing improvements and documenting them in SOPs, the project enters a new stage. The focus shifts from change to sustainment. A process audit is the primary tool for this. Think of it as a "policing process" designed to check that the new rules are being followed.

Let's watch a short clip that frames the role of audits within the Control phase of a Six Sigma project.

Control Phase - Six Sigma Project

In this segment from 'Control Phase - Six Sigma Project,' Paul Allen explains the fundamental purpose of control mechanisms, positioning audits as a necessary 'policing process' to maintain the gains achieved in the Improve phase.

Please watch from 02:24 to 03:18 and then from 07:26 to 07:56. Focus on the core idea that the Control phase is designed to audit and verify the new rules established during the Improve phase.

As the video highlights, the control system is inextricably linked to the improvements you've made. An audit plan formalizes this link, creating a structured way to verify that your new SOPs, control chart reaction plans, and mistake-proofing devices are all being used as intended. Without this verification step, processes naturally revert to old habits, and the project's hard-won gains will erode over time.


2. A Structured Approach: Layered Process Audits (LPAs)

One of the most effective ways to structure process audits in a manufacturing environment is the Layered Process Audit (LPA) system. Instead of relying solely on the Quality department, an LPA involves multiple "layers" of the organization—from team leads to plant managers—conducting short, frequent audits.

This approach has several key benefits:

  • Drives Management Engagement: It gets leaders out of their offices and onto the shop floor, showing commitment to the standards.
  • Fosters a Culture of Accountability: Everyone becomes responsible for upholding process discipline.
  • Provides Rapid Feedback: Frequent checks catch deviations before they can lead to significant quality issues.

To understand the framework, let's look at a real-world procedure.

[PDF] Layered Audit Process - Nexteer

This document from Nexteer, a global automotive supplier, outlines a formal 'Layered Audit Process.' It's an excellent example of a real-world implementation and defines the purpose and key responsibilities.

Please read section 1, 'PURPOSE,' and section 2, 'DEFINITIONS.' This will establish the goals of an LPA system, which include verifying compliance, involving management, and removing roadblocks.

The core idea is simple but powerful: different levels of management audit the same core processes, but at different frequencies. This creates overlapping layers of verification.


3. Building Your Process Audit Plan: The Key Components

A robust audit plan must clearly define four things: Who conducts the audit, What they will check, When they will check it, and How the audit is performed and followed up on. LPAs provide an excellent structure for defining these elements.

a) WHO: Defining the Layers and Responsibilities

An LPA distributes auditing responsibility across the organizational hierarchy. Each layer has a distinct role and frequency.

Layered Process Audits: Framework, Steps, and Frontline Impact - L2L

The article 'Layered Process Audits: Framework, Steps, and Frontline Impact' provides a clear pyramid diagram and description of the roles at each level.

Please read the subsection 'Levels and roles in the audit process.' Note the typical frequencies assigned to each level: daily for operators, weekly for supervisors, monthly for managers, etc.

A typical structure looks like this:

  • Layer 1: Team Leader/Operator: Daily or per-shift checks of their own area. Focus is on critical-to-quality items and adherence to SOPs.
  • Layer 2: Supervisor: Weekly audits. Broader scope, verifying Layer 1 audits are happening and checking on corrective actions.
  • Layer 3: Manager/Department Head: Monthly audits. Focus on the health of the system, trend analysis, and systemic issues.
  • Layer 4: Plant Manager/Executive: Quarterly audits. High-level check to ensure the entire LPA system is functioning and aligned with business goals.

b) WHAT: The Audit Checklist

The checklist is the heart of the audit. It translates your Control Plan and SOPs into a series of specific, objective questions. A weak checklist leads to a weak audit.

Tips for Creating an Effective Checklist:

  • Be Specific and Objective: Questions should be yes/no or based on direct observation. Avoid subjective questions like "Is the area clean?" Instead, use "Are tools stored in their designated locations on the shadow board?"
  • Focus on High-Risk Items: Prioritize questions related to your project's CTQs, key process variables from your FMEA, and safety requirements.
  • Link to Standards: Every question should trace back to a requirement in an SOP, Control Plan, or engineering specification.

The Nexteer procedure includes an excellent, detailed example of what to include in a checklist.

[PDF] Layered Audit Process - Nexteer

Let's return to the Nexteer PDF to see what a practical checklist looks like. This section details the minimum requirements and provides a great list of example items.

First, review the 'Obtain or develop a layered audit checklist' paragraph in section 4. Then, look at 'APPENDIX A – LAYERED AUDIT CHECKLIST EXAMPLE' to see how these items are formatted into a usable document.

Here is another example of a well-structured LPA checklist for a welding process.

Layered Process Audit Checklist for Welding Process
This LPA checklist template clearly defines the audit points for a welding operation. Notice how it is structured by area (Work Station, Operator, Process) and includes columns to track completion by different audit layers (Daily, Weekly, Monthly).

c) WHEN: The Audit Schedule

The schedule ensures consistency and full coverage of all critical processes over time. It visually maps out who is responsible for auditing which area and at what frequency.

The Nexteer document provides a simple but effective template for an audit schedule. The key is to make it visible and easy to track. Many plants use large, physical boards at the production line for this purpose.

Layered Process Audit (LPA) Board for Machining Department
This LPA board in a machining department is a great example of a visual management tool. It tracks weekly audit completion by shift and layer, shows overall monthly performance, and holds the templates for checklists and corrective actions.

d) HOW: Conducting the Audit & Closing the Loop

With the plan in place, the final component is the execution. The audit itself is an active process of going to the gemba (the actual place where work is done), observing the process, talking to the operator, and verifying against the checklist.

This video provides a superb practical demonstration of an auditor on the shop floor. It perfectly illustrates what a process audit aims to uncover.

IATF 16949 audits | How do I: Audit the production process use of FMEA and Control Plan

This video, titled 'IATF 16949 audits | How do I: Audit the production process use of FMEA and Control Plan,' shows an auditor investigating a customer complaint by auditing a process on the shop floor. This is exactly what your audit plan enables.

Please watch the entire video (it's short). Pay close attention to how the auditor: Interacts with the operator. Compares what the operator is doing to the documented procedures (Control Plan, FMEA, Work Instructions). Identifies non-conformities (e.g., missing master sample, mismatch in check frequency).

The video brilliantly demonstrates the most critical part of the audit process: identifying the gap between the documented process and the actual process.

Once a non-conformance is found, the loop must be closed.

  1. Immediate Containment: If there's a risk to quality, take immediate action to contain suspect products.
  2. On-the-Spot Correction: If possible, the issue should be corrected immediately (e.g., retrieving the correct tool, reminding the operator of the standard). This is often done by the Layer 1 or 2 auditor.
  3. Formal Corrective Action: For recurring or systemic issues, a formal corrective action plan is needed to address the root cause. This is a key input for continuous improvement. The LPA board in the image above has a dedicated section for tracking these actions.

4. Bringing It All Together: Your Audit Plan

To summarize, developing a process audit plan involves these key steps, adapted from the L2L article Layered Process Audits: Framework, Steps, and Frontline Impact:

  1. Define Objectives: What is the primary goal? (e.g., ensure compliance with new SOP for process XYZ, reduce defect ABC).
  2. Build the Audit Team/Structure: Define the layers (Who) and their audit frequencies (When).
  3. Develop Checklists: Create specific, objective checklists based on Control Plans and SOPs (What).
  4. Establish the Schedule: Create a visual schedule to track completion.
  5. Define the Follow-up Process: Determine the reaction plan for non-conformities (How).
  6. Train the Auditors: Ensure everyone from the operator to the plant manager understands their role and how to use the checklist.
  7. Launch and Monitor: Execute the plan and track results (e.g., audit completion rate, first-time pass rate of audits).

Conclusion

In this lesson, we have constructed a complete framework for ensuring your project's improvements are sustained over the long term. You've learned that a process audit plan is not an administrative burden but a dynamic management system that drives compliance and continuous improvement.

Key Takeaways:

  • Purpose: A process audit plan is a formal system to verify that standards (like SOPs) are being followed and that process gains are maintained.
  • LPA Framework: Layered Process Audits are a highly effective method that involves multiple levels of management in conducting frequent, short audits.
  • Key Components: A strong plan clearly defines the Who (layers), What (checklist), When (schedule), and How (execution and follow-up).
  • Closing the Loop: The goal of an audit is to identify deviations and trigger corrective action, feeding back into a cycle of continuous improvement.

Preview of the Next Lesson:

We are now nearing the end of the Control phase and the project itself. We have improved the process, created standards, and built a plan to ensure those standards are followed. The final step in project closure is to quantify the project's success. In our next lesson, we will learn how to calculate the financial impact of the project, differentiating between hard and soft savings. This will allow you to present a complete and compelling story of your project's value to leadership.