Hello again. The previous lesson traced requirements from an interconnection process to the documents that apply to a project. Now we need to locate the physical points those documents refer to. A requirement to control voltage “at the point of interconnection,” for example, is not ready for a study until that point is marked on the electrical drawing.
This lesson uses the hypothetical 100 MW solar plant introduced previously. You will learn to mark four things on a one-line diagram: the point of interconnection (POI), the point of common coupling (PCC), the study area, and equipment ownership boundaries. The aim is not to assume these boundaries coincide, but to define each one clearly enough that another engineer can use the drawing.
Read the one-line as a map of electrical connections
A one-line represents the connections among major electrical components without drawing all three phases separately. Start at the grid connection and trace the project branch through its breaker, line, transformer, and plant equipment. The line shows electrical connectivity; by itself, it does not tell you who owns each component or which location a contract calls the POI.
Reading electrical one line drawings | Eaton PSEC
Watch Eaton’s “Reading electrical one line drawings” for a quick orientation to the drawing convention before we add boundary annotations.
Watch one-line basics for what a single line represents, then tracing connections for how to follow a utility source toward connected equipment. Focus on tracing the electrical path, not on learning every equipment symbol in the full video.
For a study drawing, a useful first pass is to label each bus, branch, transformer, and connected facility along that path. A bus is an electrically connected node; a branch is a line or other connection between nodes. Those labels give you precise places to attach boundary notes instead of drawing a vague dashed line across the page.
Define the POI—and mark ownership separately
The point of interconnection is a specified electrical interface between the project’s interconnection facilities and the provider’s system. The exact contractual definition must come from the applicable project documents. FERC’s model Small Generator Interconnection Agreement (SGIA) offers a clear example of the distinction between the POI, the facilities leading to it, and ownership responsibilities.
[PDF] SMALL GENERATOR INTERCONNECTION AGREEMENT (SGIA)
Read the FERC model agreement to see how a connection point and a change of ownership can be described separately. It is an illustrative model here, not the governing agreement for our hypothetical 100 MW project.
In Attachment 1, “Glossary of Terms,” read the “Interconnection Facilities” entry on the page marked Glossary of Terms - 2: facilities to POI. On that same glossary page, find “Point of Interconnection” and read the POI definition. Then inspect Attachment 3, “One-line Diagram Depicting the Small Generating Facility, Interconnection Facilities, Metering Equipment, and Upgrades,” for the items the model agreement expects a drawing to show. Finally, in Article 1.5.5, “Responsibilities of the Parties” (page marked SGIA - 2), read from ownership responsibility through the attachment requirement. Notice that the agreement calls for an explicit allocation rather than treating the POI as an automatic ownership boundary.
On a one-line, mark the POI at an identifiable terminal or bus connection, with its voltage level and the document that defines it. Then mark the point of change of ownership wherever title to the equipment changes. These may be at different locations: for example, a provider-owned breaker might be on the project’s dedicated branch, between the network bus that serves as the POI and a customer-owned tie line.
Ownership also does not settle every responsibility. An agreement may assign design, operation, maintenance, protection, or payment obligations separately. Likewise, a meter measures at a specified electrical location; its placement does not, on its own, establish either the POI or who owns the surrounding equipment. Where the documents do not resolve a boundary, label it to be confirmed rather than inferring it from the drawing’s layout.
Define the PCC for the question being studied
The point of common coupling is a shared electrical interface relevant to how one facility affects a wider system or other users. Its precise definition depends on the applicable standard and project context. In the IEEE 1547 terminology illustrated below, the PCC is where a local electric power system connects to an area electric power system. The point where an individual distributed-resource unit connects within an electrical system is a different point.
Read the overview’s definitions to distinguish a shared-system interface from an individual resource connection. Use this older overview to understand the terminology, not to establish the current requirements for the hypothetical transmission-connected solar plant.
On slide 41, “IEEE 1547 Definitions,” find “Point of common coupling (PCC)” and read its definition; then compare the nearby “Pont of DR connection” entry, particularly the unit connection. Inspect slide 42, “1547 Interconnection Terms,” to locate both labels in its drawing. Focus on which systems meet at each point, not on treating the slides as a rule for every transmission project.
The supplied one-line of two industrial plants makes the shared-system idea visible:

The image helps distinguish a shared grid connection from equipment deeper within either plant. It also shows why labels must be read carefully: the billing-point text and dashed premises lines do not provide a complete, equipment-by-equipment ownership schedule. Nor should you assume that the PCC label on this example defines the POI for every other project.
For the solar plant, first find the applicable definition and measurement requirement. A POI and PCC can be the same electrical node in a particular arrangement, but their names answer different questions: the POI identifies the specified interconnection interface; the PCC identifies the specified common-coupling interface. If a document requires voltage or harmonic performance at the PCC, mark that node explicitly rather than substituting the inverter terminals, plant transformer, meter, or POI without verification.
Draw the study area around the question, not the property
Unlike the POI, a study area is not necessarily one electrical point. It is the portion of the interconnected system represented and assessed for a stated study question. Define it by named buses, branches, connected facilities, and—where relevant—neighboring or affected systems. State how the rest of the grid is represented, such as by an external equivalent.
Consider this illustrative arrangement, not a proposed final design for the 100 MW plant:
Existing user
|
Bus A --------------- Bus B (230 kV) ------ External grid equivalent
|
Provider-owned branch breaker
|
Terminal T: ownership changes
|
Customer-owned tie line
|
Plant step-up transformer
|
Solar plant
Suppose the project documents identify the project terminal on Bus B as the POI, and the stated study criterion identifies Bus B as the PCC because it is the shared node with the existing user. The two labels occupy the same bus in this example. Ownership, however, changes at Terminal T, farther down the project branch. The dedicated breaker between Bus B and Terminal T remains provider-owned under the example’s assumed allocation. None of those conclusions follows merely from which side of the page an item occupies; each needs a defining document or stated study assumption.
For an initial voltage and thermal-impact study, the team might define the detailed study area to include Bus A, Bus B, the existing-user connection, and the complete project branch. The wider network is represented at the indicated external equivalent. That description is more useful than drawing an unexplained circle around the plant: it tells a reviewer what is modeled in detail and what is not. A fault-duty or dynamic-performance question could require a different extent. The study area should therefore be tied to the phenomenon and checked against the applicable study procedure, rather than treated as a permanent property boundary.
A finished one-line for this example would add annotations such as “POI: Bus B project terminal, 230 kV,” “PCC: Bus B for stated criterion,” “ownership change: Terminal T,” and “detailed study area: named buses and branches; external network represented by equivalent.” Each annotation should carry its source or be visibly marked as an assumption awaiting confirmation.
Keep the boundaries auditable
Before a one-line becomes a study input, check that its four boundary labels answer four distinct questions:
| Annotation | What a reviewer should be able to determine |
|---|---|
| POI | Exactly where project interconnection facilities meet the specified system, and which agreement defines that interface |
| PCC | Which shared electrical node applies to the stated performance or power-quality criterion |
| Study area | Which facilities are modeled and assessed in detail, for which study question, and how the external system is represented |
| Ownership boundaries | The terminal or equipment where ownership changes, with responsibilities checked against the applicable attachments |
This prevents a common error: using a single “utility/customer” dashed line to stand for the POI, PCC, meter, study limit, and ownership change all at once. Those lines may coincide, but a defensible drawing shows that they do—or shows where they differ.
Key takeaways
A one-line establishes electrical connections; documents and explicit study assumptions give its boundary labels meaning. Mark the POI at the defined interconnection interface, the PCC at the applicable common-coupling node, ownership changes at identified equipment or terminals, and the study area around the network needed to answer a specific question. Do not use a meter, property line, or POI as a substitute for another boundary without checking.
In the next lesson, these marked locations will become anchors for a requirements-to-study traceability matrix: each requirement will need a source, a study method, a measurement location, and an acceptance criterion.