Hello! Welcome back to your course on Zero Voltage Switching.
In our last lesson, we discovered how the active clamp circuit elegantly recycles the problematic energy from the transformer's leakage inductance. We learned the high-level concept: this recycled energy is used to create a negative primary current, which in turn enables Zero Voltage Switching (ZVS) for the main switch, drastically reducing losses.
Today, we're going to zoom in on that process. You'll learn to explain the resonant transition between the main and clamp switches that facilitates ZVS. We will break down the switching cycle into its core phases to understand the "dance" between the inductors and capacitors that makes this efficient energy transfer possible. This is the physics behind the "what" we learned last time.
The Four States of Active Clamp Operation
To understand the resonant transitions, it's helpful to think of the active clamp flyback's switching cycle as a sequence of four distinct operating states. These states describe the flow of energy from the input, into the magnetic field, to the clamp capacitor, back into the magnetic field, and finally to the output. The transitions between these states are where the ZVS magic happens.
High-Density AC-DC Power Supplies using Active-Clamp ...
The white paper 'High-Density AC-DC Power Supplies using Active-Clamp...' from onsemi provides an excellent, clear breakdown of these four states. Let's begin by familiarizing ourselves with the overall structure of the cycle.
Read the introduction and the 'THEORY OF OPERATION' section, up to and including the descriptions for Figure 2 (A, B, C, D). This will give you a mental map of the four states we're about to analyze in detail.
Now, let's dissect the two critical transitions that facilitate ZVS.
Transition 1: Main Switch Turns OFF (Setting up ZVS for the Clamp Switch)
This is the first key moment in the cycle. The main switch (Q_MAIN) has finished its ON-time, and the transformer's magnetizing inductance is full of energy.
- Q_MAIN Turns Off: The primary current, which was flowing through Q_MAIN, cannot stop instantaneously due to the leakage and magnetizing inductances.
- Current is Diverted: This continuous current now flows into the parasitic capacitances of the switches. It charges the output capacitance (
C_oss) of Q_MAIN, causing the voltage across it (V_DS) to rise. Simultaneously, it discharges theC_ossof the auxiliary clamp switch (Q_AUX). - Clamp Diode Conducts: The voltage on the switch node continues to rise until it becomes slightly higher than the voltage on the clamp capacitor. At this point, the body diode of Q_AUX becomes forward-biased and starts to conduct the primary current.
- ZVS for Q_AUX: Because the body diode of Q_AUX is now conducting, the voltage across Q_AUX is essentially zero (just a diode drop). This creates the perfect condition to turn on Q_AUX with zero voltage switching.
This sequence ensures the clamp switch itself turns on efficiently, without incurring capacitive switching losses.
Understanding and Designing an Active Clamp Current ...
A technical document from Texas Instruments provides a concise description of this specific resonant state. It clearly explains how the main switch turn-off sets the stage for the auxiliary switch's ZVS turn-on.
Read section 2.2, titled 't1–t2: Resonant'. Focus on the description of how the primary current charges and discharges the parasitic capacitors of the switches and is then diverted through the body diode of Q_AUX.
The Resonance Period: Recycling the Energy
With Q_AUX now ON, the clamp capacitor (C_clamp) is connected across the transformer's primary, in series with the leakage inductance (L_leak). This forms a classic LC resonant tank.
- Energy that was stored in
C_clampfrom previous cycles now resonates withL_leak. - This resonance causes the primary current to reverse direction, flowing from the clamp capacitor back into the transformer. This is the "recycling" action we discussed in the last lesson. The current becomes sinusoidal, driven by the resonant frequency:
This is a critical design relationship. The values of the leakage inductance and clamp capacitor directly determine the timing of this energy recycling phase.
Transition 2: Clamp Switch Turns OFF (Setting up ZVS for the Main Switch)
This is the final and most crucial transition, where we achieve ZVS for the main power switch, Q_MAIN.
- Q_AUX Turns Off: The recycling phase ends, and Q_AUX is turned off.
- Negative Current Discharges Capacitance: The primary current is now negative (due to the resonance we just discussed). This negative current stored in the transformer's inductances needs a path. It finds one by discharging the
C_ossof Q_MAIN, pulling the voltage across Q_MAIN down towards zero. - Body Diode Conducts: The switch node voltage falls until it reaches zero, at which point the body diode of Q_MAIN becomes forward-biased and begins to conduct the negative current.
- ZVS for Q_MAIN: With the voltage across Q_MAIN at zero and its body diode conducting, the controller can now turn on Q_MAIN with virtually no switching loss. The ZVS condition is met!
For this to work, there must be enough energy stored in the inductance to fully discharge the switch node capacitance. This gives us a fundamental design constraint:
Where C_lump is the total lumped capacitance at the switch node. This equation is something you'd look for when reviewing a design, as it determines if ZVS can be achieved, especially at high input voltages where V_SW is largest.
High-Density AC-DC Power Supplies using Active-Clamp ...
Let's return to the onsemi paper. It has a fantastic set of diagrams and a clear explanation for this second transition.
Read section D, 'Transition from Resonant Power Delivery Mode to Energy Storage Mode'. Pay close attention to Figure 4, 'Zoomed Waveforms Illustrating ZVS of Main FET'. It perfectly illustrates how the negative magnetizing current (I_mag) discharges the switch node voltage (V_sw) to zero, enabling ZVS.
Visualizing the Complete Cycle
Now that we've broken down the individual transitions, let's watch them happen in sequence. The waveforms show this interplay of voltage and current over time.

Deciphering Flyback converters active clamps
Let's revisit Prof. Ben-Yaakov's detailed video. With your new understanding of the specific resonant transitions, the waveforms will make much more sense. Focus on identifying the two key transition events.
Watch the segment from 26:30 to 33:10. This time, as you watch: At 26:30 (Main Switch Turn-off): Observe VDS (blue waveform) rising as the current is diverted to the clamp circuit. This is Transition 1. At 28:50 (Clamp Switch Turn-on): Note that the clamp switch turns on while its current is already flowing (through the body diode), confirming its ZVS turn-on. From 30:00 to 31:50 (Resonance): Watch the green (I_leakage) and yellow (I_magnetizing) current waveforms. See how they interact and create the negative current needed for the next step. At 31:50 (Clamp Switch Turn-off): See how this negative current immediately pulls the blue VDS waveform down to zero. This is Transition 2, setting up ZVS for the main switch.
Test your understanding!
During the turn-on transition of the main switch (Q_MAIN), what is the specific role of the energy stored in the transformer's leakage inductance?
Show answer
The energy, which has been recycled from the clamp capacitor back into the inductances during the resonant phase, results in a negative primary current. When the clamp switch turns off, this negative current is used to discharge the parasitic output capacitance of the main switch down to zero. This action ensures the voltage across the main switch is zero before it is commanded to turn on, thus achieving ZVS.
Conclusion
In this lesson, you delved into the mechanics of the resonant transitions that are the heart of the active clamp flyback's high efficiency. You've moved from knowing that it works to understanding how it works.
Key Takeaways:
- The active clamp operation is a sequence of resonant events, not a simple on/off process.
- Transition 1 (Main OFF -> Clamp ON): The primary current charges the main switch's capacitance and is diverted through the clamp switch's body diode, allowing the clamp switch to turn on with ZVS.
- The Resonance Period (Clamp ON): The clamp capacitor and leakage inductance form a resonant tank, recycling energy and creating a negative primary current.
- Transition 2 (Clamp OFF -> Main ON): The negative primary current discharges the main switch's capacitance to zero, allowing the main switch to turn on with ZVS.
- The key players in this process are the transformer's leakage/magnetizing inductances, the clamp capacitor, and the switches' parasitic capacitances.
Now that you understand the physics of the transitions, the next logical step is to consider how a designer controls them. In our next lesson, we will identify key design parameters affecting the ZVS range, such as clamp capacitance and dead-time, bridging the gap from theory to practical design considerations.