Welcome back. The previous lesson showed that a per-query water figure depends on workload energy and on how shared facility consumption is allocated. In this final lesson, you will use that insight to evaluate two apparently conflicting claims. The goal is not to pick the smaller or larger number, but to establish whether the numbers describe the same water, activity, place, and period—and whether their supporting evidence is measured, estimated, or projected. Allow about 40–45 minutes.
Start with the claims as stated
A video places two figures side by side: approximately 0.000085 gallons per AI query and a forecast of approximately one trillion liters per year by 2028 for water associated with powering and cooling AI server facilities. Watch its introduction and its later discussion of activities that may sit outside a per-query figure.
Why is Everyone So Wrong About AI Water Use??
Watch “Why is Everyone So Wrong About AI Water Use??” by Hank Green for an example of how competing water figures enter public discussion. Treat the video's proposed explanations as leads to check, not as verification of either figure's underlying data.
Watch the two claims at the opening. Then watch training allocation, where the narrator considers which activity belongs in a per-query footprint, and electricity water, where he distinguishes water taken into a power plant from water consumed there. Note when the discussion moves from a reported number to an inference about what that number includes.
First, put the figures in consistent units. Assuming “gallons” means US gallons, the per-query claim is:
An Imperial gallon would give about milliliters instead. A gallon claim that does not identify which gallon it uses has a small but real unit ambiguity.
The forecast is already an annual total: one trillion liters in the projected year 2028, not one trillion liters per query. Spread uniformly over a 365-day year, it would average about billion liters per day; that conversion says nothing about actual daily variation. The two figures still cannot be compared directly. One has a query denominator; the other covers an annual collection of facilities and activities whose precise boundaries need checking.
Align the accounting boundaries before multiplying
To make the claims comparable, an analyst would need to establish the same answers for both:
| Boundary to align | What must be established |
|---|---|
| Activity | Is the per-query figure inference-only? Does the annual figure include training, other workloads, and shared facility operations? |
| Water flow | Is each number consumption or withdrawal? Is discharged water counted as consumed? |
| Location and source | Where is onsite water drawn, and where does electricity-related water use occur? |
| Period and denominator | What year does each figure represent? What constitutes a query, and how many covered queries occur in that year? |
| Included infrastructure | Are electricity generation and equipment manufacturing included, excluded, or reported separately? |
The video suggests that omitted training or electricity-related water could explain part of the difference. Those are important boundary tests, but the video alone does not establish the exact accounting rules behind either headline. In particular, unknown inclusion is not evidence of exclusion.
The arithmetic shows why an enormous difference is not, by itself, a contradiction. If—and only if—the annual figure covered nothing but identical queries, all assigned the stated liters each, reaching one trillion liters would require roughly:
That is a conditional equivalence, not an estimate of query traffic. The annual forecast may include activities that the per-query number does not; its location, electricity assumptions, and future operating conditions may also differ. Conversely, adding a training allocation to a per-query estimate that already contains one would double count it. Before using a query count to reconcile the figures, the numerator and denominator must cover the same services and period.
A publication on data-center water reporting provides a useful caution about seemingly concrete totals:
Data centre water consumption | npj Clean Water
Read this npj Clean Water article to see why a reported organizational water total may not establish a data-center-specific or electricity-inclusive footprint.
In “Cloud vendor water use,” read from the opening explanation of how cloud services obscure customers' resource use, beginning the reporting discussion. Focus on the distinction between an organization-wide figure and water attributable to data centers, and on the omitted electricity-generation and water-source details. The article describes reporting practices at the time it was written; do not assume those descriptions establish current reporting practices.
A published total can therefore be measured for one boundary yet unusable as a direct measurement for another. Allocating an organization's total to data centers, or a data center's total to AI queries, introduces an estimate even when the starting water bill was metered.
Check what the evidence actually is
“Measured,” “estimated,” and “projected” describe how a number was obtained, not whether its author is credible.
A measurement might be a facility's meter reading for a specified month. An estimate might combine measured electricity with a modeled grid-water intensity, or allocate measured facility water among workloads. A projection applies assumptions about future facilities, demand, efficiency, cooling, or electricity supply. One headline can contain all three: a measured baseline, estimated allocations, and a projected growth rate.
The 2024 United States Data Center Energy Usage Report explains methods used to turn incomplete observations into sector totals and future scenarios:
lbnl-2024-united-states-data-center-energy-usage-report_1.pdf
Read the report's Introduction by Lawrence Berkeley National Laboratory to distinguish an observed input from a modeled national estimate and a future extrapolation.
In Section 1, “Introduction” (printed pp. 9–11), begin where the report says methods differ. Read through the descriptions of bottom-up, top-down, and extrapolation approaches; then inspect Table 1.1, “Characteristics of the Three Main Approaches to Estimating Data Center Energy Use” (printed pp. 10–11). Focus on which inputs may be measured and which additional assumptions each approach requires, especially when it forecasts future years.
The key distinction is that a model using measurements is not itself a direct measurement of every facility it represents. Bottom-up estimates depend on equipment counts and operation; top-down estimates depend on the coverage and interpretation of aggregated data. Extrapolating either into the future adds another layer of assumptions.
The report's water results make this distinction concrete:
lbnl-2024-united-states-data-center-energy-usage-report_1.pdf
Continue with the report's water-impact results. Compare its historical estimates with its future expectations, and note the boundary of its electricity-related calculation.
In Section 5, “Water and Emission Impacts,” read “Direct Water Consumption” (printed p. 56) from the direct estimate through the 2023 breakdown; continue to its stated 2028 expectations. Then, in “Indirect Water Consumption and Emissions from Electricity Use” (printed pp. 57–59), start at the account of grid data used, the indirect method. Locate the 2023 electricity total, the nearly 800-billion-liter indirect estimate, and the paragraph explaining what the grid-mix method does not incorporate.
For US data centers of all kinds in 2023, the report estimates about billion liters of direct consumption and nearly billion liters of electricity-related consumption. It also estimates about terawatt-hours of electricity use. Its stated average indirect intensity provides a rough consistency check:
That agreement helps check the report's internal units and calculation; it does not turn its national indirect figure into meter readings at power plants attributable to individual data centers. The report uses regional grid information and assumptions where facility-level electricity-supply data are unavailable.
Nor can its 2023 US all-data-center figures simply confirm or refute the video's 2028 AI-facility forecast. The years, covered workloads, and potentially the geography differ. Adding the 2023 direct and indirect estimates is appropriate when describing that report's specified combined consumption boundary; treating the sum as a measurement of a later, differently defined forecast is not.
Reach a defensible verdict
The two headline claims are not presently a like-for-like disagreement. The per-query claim is a reported average whose underlying data and inclusion rules are not established by the video. The trillion-liter figure is presented as a future annual forecast, not a measurement of present water consumption; its primary methodology and precise boundary would need inspection before judging its magnitude. The video is a useful guide to possible sources of disagreement, but its assertion that both figures are accurate goes further than the evidence examined here permits.
A sound evaluation would retain both figures with explicit labels: reported per-query figure, scope not fully verified and 2028 annual projection, scope and assumptions to verify. It would seek the primary definitions and methods, separate onsite from electricity-related consumption, and never substitute withdrawals for consumption. If those details remain unavailable, the appropriate conclusion is “not directly comparable with the available evidence,” not “the smaller figure proves water use is negligible” or “the larger figure proves the smaller one is false.”
Key takeaways
Normalize units first, but align boundaries before comparing magnitudes. A per-query allocation, a measured facility total, a modeled sector estimate, and a future projection answer different questions. Even internally consistent calculations depend on their coverage and assumptions. Keeping those distinctions visible is the most reliable way to evaluate a data-center water claim—and to say precisely what further evidence would change your assessment.